{"id":11787,"date":"2026-07-30T09:51:47","date_gmt":"2026-07-30T09:51:47","guid":{"rendered":"https:\/\/mjarc.com\/?p=11787"},"modified":"2026-07-30T09:51:59","modified_gmt":"2026-07-30T09:51:59","slug":"preliminary-program-and-preliminary-study-architecture","status":"publish","type":"post","link":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/","title":{"rendered":"Preliminary Brief and Schematic Design in Architecture: Why They Are Essential Phases Before Detailed Design"},"content":{"rendered":"<p style=\"margin-bottom: 1.25em;\">In architecture, the earliest decisions are often those that exert the greatest influence on the final outcome of a project. Before diving into detailed design, submitting an application to the Municipal Council, or advancing to construction, it is essential to understand the starting point: the client, the site, the spatial program, legal constraints, the budget, and the full potential of the intervention.<\/p>\n<p style=\"margin-bottom: 1.25em;\">It is within this context that two fundamental phases emerge: the <strong>preliminary program<\/strong> (architectural brief) and the <strong>schematic design study<\/strong> (<em>estudo pr\u00e9vio<\/em>).<\/p>\n<p style=\"margin-bottom: 1.25em;\">Although sometimes confused, these stages serve distinct functions. The preliminary program defines the client&#8217;s needs, objectives, and project constraints. The schematic design study transforms that information into an initial architectural proposal, allowing team and client to test solutions, evaluate spatial possibilities, and prepare for subsequent phases.<\/p>\n<blockquote style=\"background-color: #f8f9fa; border-left: 4px solid #111; padding: 1.25em; margin: 1.5em 0;\">\n<p style=\"margin-bottom: 0.5em;\"><strong>MJARC Arquitetos&#8217; Perspective:<\/strong><\/p>\n<p style=\"margin-bottom: 0;\">We view these phases as a vital opportunity for listening, analysis, and decision-making. A great architectural project does not begin merely with a form. It starts with a careful reading of the place and a clear definition of what is to be built, transformed, or rehabilitated.<\/p>\n<\/blockquote>\n<h2 style=\"margin-top: 1.8em; margin-bottom: 0.8em;\">What is the preliminary program in architecture?<\/h2>\n<p style=\"margin-bottom: 1.25em;\">The preliminary program (or design brief) is the initial stage of the design process. It is where all the necessary information is gathered and organized to establish the project&#8217;s objectives. During this phase, several key aspects are thoroughly analyzed:<\/p>\n<ul style=\"margin-bottom: 1.25em;\">\n<li>\n<p style=\"margin-bottom: 0.5em;\">The intended project typology and functional program (number of bedrooms, social areas, outdoor living spaces, or technical zones);<\/p>\n<\/li>\n<li>\n<p style=\"margin-bottom: 0.5em;\">The client&#8217;s goals and target budget;<\/p>\n<\/li>\n<li>\n<p style=\"margin-bottom: 0.5em;\">Urban planning regulations, legal restrictions, and building codes;<\/p>\n<\/li>\n<li>\n<p style=\"margin-bottom: 0.5em;\">Site characteristics or existing building condition (topography, solar orientation, access ways, public utilities, and surroundings);<\/p>\n<\/li>\n<li>\n<p style=\"margin-bottom: 0.5em;\">Elements to be preserved, adapted, or transformed in the case of a rehabilitation project.<\/p>\n<\/li>\n<\/ul>\n<p style=\"margin-bottom: 1.25em;\">Whenever applicable, the client should gather foundational documentation, such as topographical surveys, architectural surveys of existing structures, land registry certificates (<em>certid\u00e3o predial<\/em>), tax property cards (<em>caderneta predial<\/em>), site plans, site photography, cadastral information, and other relevant documents.<\/p>\n<p style=\"margin-bottom: 1.25em;\">This phase is particularly crucial before purchasing land or a property. A preliminary feasibility analysis helps determine whether the intended design concept is compatible with the site, applicable local regulations, and planned financial investment.<\/p>\n<h2 style=\"margin-top: 1.8em; margin-bottom: 0.8em;\">Why is the preliminary program so important?<\/h2>\n<p style=\"margin-bottom: 1.25em;\">The preliminary program aligns expectations long before drawing begins. Without this phase, a project risks building upon fragile assumptions: unrealistic floor areas, ignorance of urban planning constraints, a budget incompatible with design ambitions, or a lack of clarity regarding client priorities.<\/p>\n<p style=\"margin-bottom: 1.25em;\">A well-developed preliminary brief helps to:<\/p>\n<ul style=\"margin-bottom: 1.25em;\">\n<li>\n<p style=\"margin-bottom: 0.5em;\">Reduce uncertainties and identify potential risks at an early stage;<\/p>\n<\/li>\n<li>\n<p style=\"margin-bottom: 0.5em;\">Clarify core objectives and establish strategic priorities;<\/p>\n<\/li>\n<li>\n<p style=\"margin-bottom: 0.5em;\">Evaluate overall project feasibility and guide the schematic design phase;<\/p>\n<\/li>\n<li>\n<p style=\"margin-bottom: 0.5em;\">Avoid costly, radical design changes during advanced stages of work.<\/p>\n<\/li>\n<\/ul>\n<p style=\"margin-bottom: 1.25em;\">It is also during this phase that the scope of architectural services, <a href=\"https:\/\/mjarc.com\/en\/architecture-and-architect-fees-in-portugal\/\">architectural fees<\/a>, project schedule, and mutual responsibilities must be agreed upon. In Portugal, hiring architectural services must be formalized in writing, clearly specifying all services to be delivered.<\/p>\n<h2 style=\"margin-top: 1.8em; margin-bottom: 0.8em;\">What is the schematic design study (Estudo Pr\u00e9vio)?<\/h2>\n<p style=\"margin-bottom: 1.25em;\">The schematic design study (known in Portugal as <em>estudo pr\u00e9vio<\/em>) is the phase where the architect translates the approved brief into a concrete architectural proposal. Drawing on the data gathered during the preliminary program, initial solutions for building footprint, spatial layout, volumetric massing, site integration, functional distribution, architectural language, and contextual articulation are developed.<\/p>\n<p style=\"margin-bottom: 1.25em;\">Key deliverables produced during this phase include:<\/p>\n<ul style=\"margin-bottom: 1.25em;\">\n<li>\n<p style=\"margin-bottom: 0.5em;\">Schematic floor plans, key sections, and preliminary elevations;<\/p>\n<\/li>\n<li>\n<p style=\"margin-bottom: 0.5em;\">Site layout plan and spatial organization diagrams;<\/p>\n<\/li>\n<li>\n<p style=\"margin-bottom: 0.5em;\">3D visualizations (architectural renders) or physical scale models, where appropriate;<\/p>\n<\/li>\n<li>\n<p style=\"margin-bottom: 0.5em;\">Studies evaluating site topography, natural daylighting, and view corridors;<\/p>\n<\/li>\n<li>\n<p style=\"margin-bottom: 0.5em;\">Preliminary area schedules, material palettes, atmosphere, and design concept narratives.<\/p>\n<\/li>\n<\/ul>\n<p style=\"margin-bottom: 1.25em;\">The goal of schematic design is not yet to specify every construction detail. Its purpose is to test, refine, and consolidate the design concept before advancing to technical phases, such as municipal licensing drawings, engineering specialty projects, and detailed construction documentation.<\/p>\n<div style=\"background-color: #f8f9fa; border: 1px solid #e9ecef; border-left: 4px solid #111; padding: 1.25em; margin: 1.5em 0;\">\n<p style=\"margin-bottom: 0.5em; font-weight: bold;\">Related Guide:<\/p>\n<p style=\"margin-bottom: 0;\">Discover all the essential stages and key precautions in our comprehensive guide on <a href=\"https:\/\/mjarc.com\/en\/building-a-house-portugal-steps-to-building-your-home\/\">how to build a house in Portugal<\/a>.<\/p>\n<\/div>\n<h2 style=\"margin-top: 1.8em; margin-bottom: 0.8em;\">Preliminary program vs. schematic design: what is the difference?<\/h2>\n<p style=\"margin-bottom: 1.25em;\">The key distinction lies in the type of decisions made at each milestone:<\/p>\n<ul style=\"margin-bottom: 1.25em;\">\n<li>\n<p style=\"margin-bottom: 0.5em;\"><strong>Preliminary Program:<\/strong> Answers the core question: <em>&#8220;What do we want to achieve and what are the constraints?&#8221;<\/em> (Establishing needs, parameters, goals, and baseline information).<\/p>\n<\/li>\n<li>\n<p style=\"margin-bottom: 0.5em;\"><strong>Schematic Design (Estudo Pr\u00e9vio):<\/strong> Answers the question: <em>&#8220;How can these objectives take physical shape through architecture?&#8221;<\/em> (Translating data into spatial, volumetric, and aesthetic proposals).<\/p>\n<\/li>\n<\/ul>\n<p style=\"margin-bottom: 1.25em;\">Both stages are essential. Without a rigorous preliminary brief, schematic design risks missing the client&#8217;s goals. Without a solid schematic design study, a project risks moving into municipal permitting without the necessary maturity.<\/p>\n<h2 style=\"margin-top: 1.8em; margin-bottom: 0.8em;\">Legal and regulatory framework in Portugal<\/h2>\n<p style=\"margin-bottom: 1.25em;\">In Portugal, urban planning procedures are governed by the Legal Regime of Urbanization and Construction (RJUE \u2014 <em>Regime Jur\u00eddico da Urbaniza\u00e7\u00e3o e Edifica\u00e7\u00e3o<\/em>), approved by Decree-Law no. 555\/99 of December 16, as amended, including updates introduced by Decree-Law no. 10\/2024 of January 8 (the <em>Simplex Urban\u00edstico<\/em>).<\/p>\n<p style=\"margin-bottom: 1.25em;\">The RJUE regulates prior control procedures for urban operations (such as municipal licensing, prior communication, or exemptions). The structure of project phases is also supported by technical benchmarks such as Ordinance no. 701-H\/2008, which defines standard project phases and deliverables.<\/p>\n<blockquote style=\"background-color: #fff3cd; border-left: 4px solid #ffc107; padding: 1em 1.25em; margin: 1.5em 0;\">\n<p style=\"margin-bottom: 0.5em;\"><strong>Attention to Local Planning Rules:<\/strong><\/p>\n<p style=\"margin-bottom: 0;\">Specific technical evaluations must be performed case by case, taking into account the local municipality, the Municipal Master Plan (PDM \u2014 <em>Plano Diretor Municipal<\/em>), detailed local plans, administrative easements, public utility restrictions, and municipal building codes.<\/p>\n<\/blockquote>\n<p style=\"margin-bottom: 1.25em;\">Want to learn more about municipal review timelines? Understand <a href=\"https:\/\/mjarc.com\/en\/en-building-permit-portugal-timeline\/\">how long it takes to get a building permit in Portugal<\/a>.<\/p>\n<h2 style=\"margin-top: 1.8em; margin-bottom: 0.8em;\">When do engineering specialty projects begin?<\/h2>\n<p style=\"margin-bottom: 1.25em;\">Engineering specialty projects (<em>projetos de especialidades<\/em>) should be coordinated with the architectural design from an early stage, particularly in complex developments. However, in practical terms, it is after schematic design is consolidated and during the development of municipal licensing drawings that this multidisciplinary coordination achieves full detail.<\/p>\n<p style=\"margin-bottom: 1.25em;\">Specialty projects typically include structural engineering, water and drainage networks, thermal performance, acoustic insulation, electrical systems, telecommunications (ITED), fire safety, and HVAC systems. Early coordination prevents on-site trade conflicts and minimizes revisions during municipal review.<\/p>\n<h2 style=\"margin-top: 1.8em; margin-bottom: 0.8em;\">Preliminary brief and schematic design in rehabilitation projects<\/h2>\n<p style=\"margin-bottom: 1.25em;\">In urban rehabilitation projects, these early stages take on added importance. Before transforming an existing building, one must thoroughly understand its structural integrity, materials, daylight patterns, circulation, and hidden spatial qualities. Based on this diagnosis, the project establishes what to preserve, adapt, or transform.<\/p>\n<p style=\"margin-bottom: 1.25em;\">The preliminary program confirms whether the proposed new function is compatible with the historical structure, while the schematic design study tests spatial adaptations, balancing historic memory, energy performance, and modern comfort.<\/p>\n<p style=\"margin-bottom: 1.25em;\">When intervening within historic city centers, we recommend consulting our article on <a href=\"https:\/\/mjarc.com\/en\/zona_aru_e_oru\/\">ARU and ORU urban rehabilitation zones and their tax incentives in Portugal<\/a>.<\/p>\n<h2 style=\"margin-top: 1.8em; margin-bottom: 0.8em;\">The MJARC Arquitetos methodology<\/h2>\n<p style=\"margin-bottom: 1.25em;\">At MJARC Arquitetos, we guide these initial milestones with meticulous attention to site topography, solar geometry, landscape relationships, and the performance of <a href=\"https:\/\/mjarc.com\/en\/building-a-sustainable-house-5-tips-for-efficiency-and-style\/\">sustainable buildings<\/a>. Schematic design is far more than an appealing visual image\u2014it is a decision-making tool that builds a shared vision before advancing to definitive technical documentation.<\/p>\n<div style=\"background-color: #e9ecef; border-radius: 4px; padding: 1.25em; margin: 2em 0; text-align: center;\">\n<h3 style=\"margin-top: 0; margin-bottom: 0.5em;\">Looking for an architecture team to start your project?<\/h3>\n<p style=\"margin-bottom: 1em;\">We accompany your project from initial feasibility studies through to site supervision. Share your vision with us and let us transform it into a solid architectural proposal.<\/p>\n<p><a style=\"background-color: #111; color: #fff; padding: 10px 20px; text-decoration: none; font-weight: bold; border-radius: 3px; display: inline-block;\" href=\"https:\/\/mjarc.com\/en\/contacts\/\">Contact MJARC Arquitetos<\/a><\/p>\n<\/div>\n<h2 style=\"margin-top: 1.8em; margin-bottom: 0.8em;\">Frequently asked questions<\/h2>\n<ul style=\"margin-bottom: 1.25em;\">\n<li style=\"margin-bottom: 0.75em;\"><strong>Is a preliminary program legally mandatory?<\/strong> It does not always appear as a separate formal contract phase, but it is an essential step to define objectives, space requirements, budget, constraints, and feasibility before drawing begins.<\/li>\n<li style=\"margin-bottom: 0.75em;\"><strong>Can a schematic design study be submitted directly to the Municipal Council?<\/strong> Generally, no. Schematic design (<em>estudo pr\u00e9vio<\/em>) is meant for internal refinement and client validation. For municipal submission, the application must be formalized with the required architectural drawings and technical documentation mandated by the RJUE.<\/li>\n<li style=\"margin-bottom: 0.75em;\"><strong>Does schematic design include complete engineering projects?<\/strong> Not in full detail. While conceptual alignment with engineering specialists occurs, detailed technical engineering plans are developed in subsequent phases once the architectural design is consolidated.<\/li>\n<li style=\"margin-bottom: 0.75em;\"><strong>How long does a schematic design study take?<\/strong> It depends on project scale and complexity. For a single-family home or rehabilitation project, it typically takes several weeks, encompassing urban planning research, site visits, and testing multiple design hypotheses.<\/li>\n<li style=\"margin-bottom: 0.75em;\"><strong>Why not skip schematic design and go straight to municipal licensing?<\/strong> Because municipal permitting requires a mature, thoroughly tested design solution. Submitting a project without a consolidated schematic design often results in municipal rejections, project delays, trade conflicts, and unforeseen costs.<\/li>\n<\/ul>\n<h4 style=\"margin-top: 1.8em; margin-bottom: 0.8em;\">References and legal framework<\/h4>\n<ul style=\"margin-bottom: 1.25em;\">\n<li style=\"margin-bottom: 0.5em;\"><span style=\"font-size: 8pt;\">Decree-Law no. 555\/99, of December 16 \u2014 <em>Legal Regime of Urbanization and Construction (RJUE)<\/em>.<\/span><\/li>\n<li style=\"margin-bottom: 0.5em;\"><span style=\"font-size: 8pt;\">Decree-Law no. 10\/2024, of January 8 \u2014 <em>Urban Planning Simplification Regime (Simplex Urban\u00edstico)<\/em>.<\/span><\/li>\n<li style=\"margin-bottom: 0.5em;\"><span style=\"font-size: 8pt;\">Law no. 31\/2009, of July 3 \u2014 <em>Professional qualifications required for technical project signatories<\/em>.<\/span><\/li>\n<li style=\"margin-bottom: 0.5em;\"><span style=\"font-size: 8pt;\">Ordinance no. 701-H\/2008, of July 29 \u2014 <em>Reference guidelines for project phases and content<\/em>.<\/span><\/li>\n<\/ul>\n<p style=\"font-size: 9pt; color: #666; margin-top: 1em;\"><em>Note: The information provided herein is for general informational purposes and does not replace consultation with current legislation, applicable municipal regulations, and qualified technical professionals tailored to specific project contexts.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In architecture, the earliest decisions are often those that exert the greatest influence on the final outcome of a project. Before diving into detailed design, submitting an application to the Municipal Council, or advancing to construction, it is essential to understand the starting point: the client, the site, the spatial program, legal constraints, the budget, [&hellip;]<\/p>\n<p class=\"read-more\"><a class=\"button\" href=\"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/\">Read More<\/a><\/p>\n","protected":false},"author":2,"featured_media":11780,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[31],"tags":[],"class_list":["post-11787","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-arquitetura-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Preliminary Program &amp; Schematic Design in Architecture | MJARC<\/title>\n<meta name=\"description\" content=\"Learn the difference between preliminary brief and schematic design, what each stage includes, and why they matter before municipal permitting.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Preliminary Program &amp; Schematic Design in Architecture | MJARC\" \/>\n<meta property=\"og:description\" content=\"Learn the difference between preliminary brief and schematic design, what each stage includes, and why they matter before municipal permitting.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/\" \/>\n<meta property=\"og:site_name\" content=\"Mjarc\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/mjarc.arquitectos\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-30T09:51:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-30T09:51:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mjarc.com\/wp-content\/uploads\/2024\/05\/estudo-previo-arquitetura-mjarc-arquitetos.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"853\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Mjarc\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mjarc\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/\"},\"author\":{\"name\":\"Mjarc\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#\\\/schema\\\/person\\\/4b3afbd73b7217bd7abd6435d1e05f2e\"},\"headline\":\"Preliminary Brief and Schematic Design in Architecture: Why They Are Essential Phases Before Detailed Design\",\"datePublished\":\"2026-07-30T09:51:47+00:00\",\"dateModified\":\"2026-07-30T09:51:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/\"},\"wordCount\":1506,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/estudo-previo-arquitetura-mjarc-arquitetos.jpg\",\"articleSection\":[\"Architecture\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/\",\"url\":\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/\",\"name\":\"Preliminary Program & Schematic Design in Architecture | MJARC\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/estudo-previo-arquitetura-mjarc-arquitetos.jpg\",\"datePublished\":\"2026-07-30T09:51:47+00:00\",\"dateModified\":\"2026-07-30T09:51:59+00:00\",\"description\":\"Learn the difference between preliminary brief and schematic design, what each stage includes, and why they matter before municipal permitting.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/#primaryimage\",\"url\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/estudo-previo-arquitetura-mjarc-arquitetos.jpg\",\"contentUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/estudo-previo-arquitetura-mjarc-arquitetos.jpg\",\"width\":1500,\"height\":853,\"caption\":\"Programa preliminar e Estudo Pr\u00e9vio Arquitetura - MJARC Arquitetos\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/preliminary-program-and-preliminary-study-architecture\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/mjarc.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Preliminary Brief and Schematic Design in Architecture: Why They Are Essential Phases Before Detailed Design\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/\",\"name\":\"Mjarc\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#organization\",\"name\":\"Mjarc\",\"url\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/logo_black_1.png\",\"contentUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/logo_black_1.png\",\"width\":130,\"height\":130,\"caption\":\"Mjarc\"},\"image\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/mjarc.arquitectos\\\/\",\"https:\\\/\\\/www.instagram.com\\\/mjarc.arq\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#\\\/schema\\\/person\\\/4b3afbd73b7217bd7abd6435d1e05f2e\",\"name\":\"Mjarc\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/litespeed\\\/avatar\\\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1785438480\",\"url\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/litespeed\\\/avatar\\\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1785438480\",\"contentUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/litespeed\\\/avatar\\\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1785438480\",\"caption\":\"Mjarc\"},\"url\":\"https:\\\/\\\/mjarc.com\\\/en\\\/author\\\/mjarc1\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Preliminary Program & Schematic Design in Architecture | MJARC","description":"Learn the difference between preliminary brief and schematic design, what each stage includes, and why they matter before municipal permitting.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/","og_locale":"en_US","og_type":"article","og_title":"Preliminary Program & Schematic Design in Architecture | MJARC","og_description":"Learn the difference between preliminary brief and schematic design, what each stage includes, and why they matter before municipal permitting.","og_url":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/","og_site_name":"Mjarc","article_publisher":"https:\/\/www.facebook.com\/mjarc.arquitectos\/","article_published_time":"2026-07-30T09:51:47+00:00","article_modified_time":"2026-07-30T09:51:59+00:00","og_image":[{"width":1500,"height":853,"url":"https:\/\/mjarc.com\/wp-content\/uploads\/2024\/05\/estudo-previo-arquitetura-mjarc-arquitetos.jpg","type":"image\/jpeg"}],"author":"Mjarc","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Mjarc","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/#article","isPartOf":{"@id":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/"},"author":{"name":"Mjarc","@id":"https:\/\/mjarc.com\/fr\/#\/schema\/person\/4b3afbd73b7217bd7abd6435d1e05f2e"},"headline":"Preliminary Brief and Schematic Design in Architecture: Why They Are Essential Phases Before Detailed Design","datePublished":"2026-07-30T09:51:47+00:00","dateModified":"2026-07-30T09:51:59+00:00","mainEntityOfPage":{"@id":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/"},"wordCount":1506,"commentCount":0,"publisher":{"@id":"https:\/\/mjarc.com\/fr\/#organization"},"image":{"@id":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/#primaryimage"},"thumbnailUrl":"https:\/\/mjarc.com\/wp-content\/uploads\/2024\/05\/estudo-previo-arquitetura-mjarc-arquitetos.jpg","articleSection":["Architecture"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/","url":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/","name":"Preliminary Program & Schematic Design in Architecture | MJARC","isPartOf":{"@id":"https:\/\/mjarc.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/#primaryimage"},"image":{"@id":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/#primaryimage"},"thumbnailUrl":"https:\/\/mjarc.com\/wp-content\/uploads\/2024\/05\/estudo-previo-arquitetura-mjarc-arquitetos.jpg","datePublished":"2026-07-30T09:51:47+00:00","dateModified":"2026-07-30T09:51:59+00:00","description":"Learn the difference between preliminary brief and schematic design, what each stage includes, and why they matter before municipal permitting.","breadcrumb":{"@id":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/#primaryimage","url":"https:\/\/mjarc.com\/wp-content\/uploads\/2024\/05\/estudo-previo-arquitetura-mjarc-arquitetos.jpg","contentUrl":"https:\/\/mjarc.com\/wp-content\/uploads\/2024\/05\/estudo-previo-arquitetura-mjarc-arquitetos.jpg","width":1500,"height":853,"caption":"Programa preliminar e Estudo Pr\u00e9vio Arquitetura - MJARC Arquitetos"},{"@type":"BreadcrumbList","@id":"https:\/\/mjarc.com\/en\/preliminary-program-and-preliminary-study-architecture\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/mjarc.com\/en\/"},{"@type":"ListItem","position":2,"name":"Preliminary Brief and Schematic Design in Architecture: Why They Are Essential Phases Before Detailed Design"}]},{"@type":"WebSite","@id":"https:\/\/mjarc.com\/fr\/#website","url":"https:\/\/mjarc.com\/fr\/","name":"Mjarc","description":"","publisher":{"@id":"https:\/\/mjarc.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mjarc.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mjarc.com\/fr\/#organization","name":"Mjarc","url":"https:\/\/mjarc.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mjarc.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/08\/logo_black_1.png","contentUrl":"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/08\/logo_black_1.png","width":130,"height":130,"caption":"Mjarc"},"image":{"@id":"https:\/\/mjarc.com\/fr\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/mjarc.arquitectos\/","https:\/\/www.instagram.com\/mjarc.arq\/"]},{"@type":"Person","@id":"https:\/\/mjarc.com\/fr\/#\/schema\/person\/4b3afbd73b7217bd7abd6435d1e05f2e","name":"Mjarc","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mjarc.com\/wp-content\/litespeed\/avatar\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1785438480","url":"https:\/\/mjarc.com\/wp-content\/litespeed\/avatar\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1785438480","contentUrl":"https:\/\/mjarc.com\/wp-content\/litespeed\/avatar\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1785438480","caption":"Mjarc"},"url":"https:\/\/mjarc.com\/en\/author\/mjarc1\/"}]}},"_links":{"self":[{"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/posts\/11787","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/comments?post=11787"}],"version-history":[{"count":4,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/posts\/11787\/revisions"}],"predecessor-version":[{"id":19279,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/posts\/11787\/revisions\/19279"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/media\/11780"}],"wp:attachment":[{"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/media?parent=11787"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/categories?post=11787"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/tags?post=11787"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}