{"id":19870,"date":"2026-10-09T15:54:07","date_gmt":"2026-10-09T15:54:07","guid":{"rendered":"https:\/\/mjarc.com\/?p=19870"},"modified":"2026-10-09T15:56:17","modified_gmt":"2026-10-09T15:56:17","slug":"prior-information-request-pip-portugal","status":"publish","type":"post","link":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/","title":{"rendered":"Prior Information Request (PIP): Understanding a Plot\u2019s Potential Before Building"},"content":{"rendered":"<p>Before designing a house, transforming an existing building or investing in a plot of land, there is one essential question: <strong>what can actually be built here?<\/strong><\/p>\n<p>The answer depends on more than the size of the plot or the buildings that surround it. It also depends on planning regulations, environmental constraints, the characteristics of the landscape and the site&#8217;s potential for transformation.<\/p>\n<p>In Portugal, a <strong>Prior Information Request (Pedido de Informa\u00e7\u00e3o Pr\u00e9via, or PIP)<\/strong> allows these questions to be clarified with the local municipality before moving into the more demanding and costly stages of a project.<\/p>\n<p>Following amendments to Portugal&#8217;s Legal Framework for Urbanisation and Building (RJUE), which came into force on <strong>1 October 2026<\/strong>, the PIP has become even more significant. Under certain conditions, a favourable response may exempt a development from the usual licensing or prior notification procedures.<\/p>\n<p>Understanding when to request a PIP, which type to choose and the implications of a favourable decision is therefore essential for anyone considering construction, renovation or property investment in Portugal.<\/p>\n<h2>What Is a Prior Information Request (PIP) in Portugal?<\/h2>\n<p>A Prior Information Request is a procedure established under <strong>Article 14 of the RJUE<\/strong> (Regime Jur\u00eddico da Urbaniza\u00e7\u00e3o e da Edifica\u00e7\u00e3o), through which any interested party may ask the local municipality to assess the feasibility of a proposed development.<\/p>\n<p>Its purpose is to clarify what can be done with a plot of land or an existing building, and which restrictions apply, before making significant financial commitments.<\/p>\n<p>Depending on the nature of the request, the municipality may assess:<\/p>\n<ul>\n<li>Whether a building can be constructed, extended or renovated;<\/li>\n<li>Permitted uses, such as residential, commercial, services or tourism;<\/li>\n<li>Maximum permitted building footprint and floor area;<\/li>\n<li>Building height, volume and number of storeys;<\/li>\n<li>Access arrangements and infrastructure requirements;<\/li>\n<li>Environmental, heritage and planning restrictions;<\/li>\n<li>Compliance with the Municipal Master Plan (Plano Diretor Municipal, or PDM) and other applicable land-use plans.<\/li>\n<\/ul>\n<p>More than an administrative procedure, <strong>a PIP represents an initial exercise in understanding a place and its potential for transformation<\/strong>.<\/p>\n<h2>When Is It Worth Applying for a PIP?<\/h2>\n<p>Although a PIP is generally not mandatory, it can be particularly valuable when there are uncertainties about the feasibility of a development or when a formal municipal position is needed before committing to an investment.<\/p>\n<h3>Before Buying a Plot of Land<\/h3>\n<p>A plot advertised as urban land or as having development potential does not necessarily allow the construction of the building a buyer has in mind.<\/p>\n<p>The Municipal Master Plan, easements and other restrictions may limit the permitted floor area, building footprint, number of storeys or intended use.<\/p>\n<p>Applying for a PIP before purchasing can help clarify these conditions and reduce the risk of acquiring land that cannot accommodate the proposed project.<\/p>\n<h3>Before Renovating or Extending a Building<\/h3>\n<p>In renovation projects, the possibilities for intervention often depend on the building&#8217;s planning history, existing characteristics and potential heritage restrictions.<\/p>\n<p>A PIP can clarify, for example, whether an extension is permitted, whether the building&#8217;s use can be changed or whether alterations to its volume may be accepted.<\/p>\n<h3>Before Developing a Property or Tourism Investment<\/h3>\n<p>For multi-family residential developments, hotels or nature-based tourism projects, planning feasibility directly influences the programme, scale and financial model of the investment.<\/p>\n<p>An early assessment helps identify opportunities and limitations while the project can still be adapted.<\/p>\n<p>This is particularly important for sites within the National Agricultural Reserve (RAN), the National Ecological Reserve (REN) or other protected or restricted areas.<\/p>\n<h2>Simple PIP vs Qualified PIP: What Is the Difference?<\/h2>\n<p>The RJUE provides for two main types of Prior Information Request, commonly referred to as a <strong>simple PIP<\/strong> and a <strong>qualified PIP<\/strong>.<\/p>\n<p>The main differences lie in the level of detail submitted and the legal effects of the municipality&#8217;s response.<\/p>\n<h3>Simple PIP: Clarifying Development Feasibility<\/h3>\n<p>A simple PIP, provided for under <strong>Article 14(1)<\/strong>, allows applicants to understand the general development possibilities of a site without necessarily preparing a fully developed architectural project.<\/p>\n<p>It is particularly useful when assessing a property before purchase or clarifying a specific planning question.<\/p>\n<p>A favourable response under this procedure binds the competent authorities in accordance with Article 17(1), but <strong>does not automatically remove the need for subsequent licensing or prior notification procedures<\/strong>.<\/p>\n<h3>Qualified PIP: Assessing a Defined Proposal<\/h3>\n<p>A qualified PIP, provided for under <strong>Article 14(2)<\/strong>, requires a more detailed description of the proposed development.<\/p>\n<p>Depending on the project, this may include architectural drawings, building placement, volume, intended uses and integration into the urban or natural landscape.<\/p>\n<p>The main difference concerns its legal effects: <strong>when a favourable qualified PIP covers all the legally applicable requirements, the development may be exempt from licensing or prior notification<\/strong>, in accordance with Article 17(2).<\/p>\n<p>This does not mean that construction can begin without fulfilling other legal obligations, including those relating to the notification of commencement of works and the execution of the project.<\/p>\n<p><strong>Which option should you choose?<\/strong> A simple PIP may be sufficient to establish the general feasibility of a plot. A qualified PIP may be more appropriate when a specific proposal has already been developed and the applicant wishes to obtain a decision with broader legal effects. The choice should follow a technical assessment of each project.<\/p>\n<h2>What Changed Under Portugal&#8217;s 2026 Planning Regulations?<\/h2>\n<p>The revision of the RJUE, introduced by <strong>Decree-Law No. 108\/2026 of 29 May<\/strong>, came into force on <strong>1 October 2026<\/strong>, following the postponement established by Decree-Law No. 155-B\/2026.<\/p>\n<p><strong>Ministerial Order No. 320\/2026\/1 of 31 July<\/strong> complemented this framework by introducing updated application forms and rules governing the documentation required for planning procedures.<\/p>\n<p>Three developments are particularly relevant.<\/p>\n<h3>Greater Importance of the Qualified PIP<\/h3>\n<p>A favourable Prior Information Request covering all applicable requirements under Article 14(2) may exempt the proposed development from licensing or prior notification.<\/p>\n<p>This makes a qualified PIP particularly relevant for projects that have already reached a sufficient level of development, although it also demands more comprehensive technical preparation.<\/p>\n<h3>Updated Application Requirements<\/h3>\n<p>Ministerial Order No. 320\/2026\/1 establishes standardised application forms and defines, in Annex V, the documentation required for each type of request and development.<\/p>\n<p>The objective is to clarify submission requirements and make procedures more consistent.<\/p>\n<h3>Greater Importance of Early Preparation<\/h3>\n<p>The revised RJUE introduced stricter rules for reviewing applications and requesting corrections.<\/p>\n<p>Complete documentation and a well-supported proposal are therefore essential to avoid delays and reduce the need for additional clarification.<\/p>\n<p>Despite administrative simplification, territorial, environmental and heritage constraints remain fundamental to assessing whether a development is feasible.<\/p>\n<h2>How Long Does a PIP Take in Portugal?<\/h2>\n<p>The statutory deadlines depend on the type of PIP and the nature of the proposed development.<\/p>\n<p>Under <strong>Article 16 of the RJUE<\/strong>, the decision periods are generally:<\/p>\n<ul>\n<li><strong>Simple PIP:<\/strong> 15 days;<\/li>\n<li><strong>Qualified PIP for building works and other developments excluding land subdivisions:<\/strong> 30 days;<\/li>\n<li><strong>Qualified PIP for land subdivision operations:<\/strong> 45 days.<\/li>\n<\/ul>\n<p>These decision periods are calculated in accordance with the RJUE, following the preliminary review and validation stage, which generally has a 20-day deadline.<\/p>\n<p>It is important to distinguish the statutory deadlines for each procedural stage from the actual time required to complete the application process.<\/p>\n<p>Requests for additional documentation, consultation with external authorities and other legally permitted circumstances may affect the overall duration.<\/p>\n<p>Careful preparation of the application can reduce the likelihood of interruptions and make the process more predictable.<\/p>\n<p>To understand how planning procedures affect the overall construction schedule, read our article <strong><a href=\"https:\/\/mjarc.com\/en\/en-building-permit-portugal-timeline\/\">How Long Does a Building Permit Take in Portugal?<\/a><\/strong>.<\/p>\n<h2>What Documents Are Required for a PIP?<\/h2>\n<p>The required documentation depends on the type of application and the proposed development.<\/p>\n<p><strong>Ministerial Order No. 320\/2026\/1<\/strong>, particularly Annex V, establishes the applicable submission requirements.<\/p>\n<h3>Documents for a Simple PIP<\/h3>\n<p>A simple PIP generally requires less extensive documentation, which may include:<\/p>\n<ul>\n<li>Property identification and registration documents;<\/li>\n<li>A location plan identifying the plot boundaries;<\/li>\n<li>A written description of the proposed development;<\/li>\n<li>Additional drawings, where necessary or useful.<\/li>\n<\/ul>\n<p>The purpose is to provide the municipality with sufficient information to understand the planning question being submitted.<\/p>\n<h3>Documents for a Qualified PIP<\/h3>\n<p>A qualified PIP requires more detailed documentation and may involve:<\/p>\n<ul>\n<li>A topographical survey and site layout plan;<\/li>\n<li>A detailed design statement;<\/li>\n<li>Demonstration of compliance with the Municipal Master Plan and other applicable regulations;<\/li>\n<li>Architectural drawings;<\/li>\n<li>A schedule of relevant planning parameters;<\/li>\n<li>Professional responsibility declarations and supporting technical documentation.<\/li>\n<\/ul>\n<p>The exact requirements depend on the nature of the development and the applicable legal provisions.<\/p>\n<p><strong>Accurate documentation is not simply an administrative requirement:<\/strong> it allows the proposal to be clearly communicated and its feasibility to be properly demonstrated.<\/p>\n<h2>How Much Does a PIP Cost in Portugal?<\/h2>\n<p>The cost of a Prior Information Request varies according to the municipality and the complexity of the proposed development.<\/p>\n<p>Generally, two types of costs should be considered.<\/p>\n<p><strong>Municipal fees:<\/strong> established under the relevant municipality&#8217;s schedule of fees.<\/p>\n<p><strong>Professional fees and technical studies:<\/strong> associated with planning analysis, document preparation and the development of the necessary architectural information.<\/p>\n<p>A simple PIP intended to clarify the general feasibility of a plot may require less technical work than a qualified PIP supported by a developed architectural proposal.<\/p>\n<p>The cost should therefore be assessed in relation to the project&#8217;s complexity and the level of certainty required before proceeding.<\/p>\n<h2>Does a Favourable PIP Guarantee That I Can Build?<\/h2>\n<p><strong>Not necessarily.<\/strong> The legal effects of a favourable response depend on the type of PIP and the matters assessed.<\/p>\n<p>A favourable simple PIP binds the competent authorities within the limits established by law, but does not automatically replace subsequent planning procedures.<\/p>\n<p>A favourable qualified PIP covering all legally applicable requirements may, however, exempt the development from licensing or prior notification.<\/p>\n<p>Even in these circumstances, the project must comply fully with the assessed proposal and all remaining legal and technical obligations.<\/p>\n<h3>How Long Is a Favourable PIP Valid?<\/h3>\n<p><strong>Article 17 of the RJUE<\/strong> generally establishes a <strong>two-year period<\/strong> in which to initiate the subsequent procedure or commence the development, depending on the type of PIP.<\/p>\n<p>If this period expires, the law provides a mechanism through which the applicant may request confirmation, on a single occasion, that the factual and legal circumstances underlying the favourable decision remain unchanged.<\/p>\n<p>Where that confirmation is obtained, or the legally established effects of a lack of response apply, an additional one-year period may become available under the RJUE.<\/p>\n<p>For property investors, these deadlines should be considered as part of the overall development strategy.<\/p>\n<h2>Is a PIP Mandatory Before Building in Portugal?<\/h2>\n<p><strong>Generally, no.<\/strong> A Prior Information Request is an optional procedure.<\/p>\n<p>Where a development meets the relevant legal requirements, it may be possible to proceed directly to the applicable planning procedure without submitting a PIP.<\/p>\n<p>However, when there are uncertainties concerning development capacity, permitted uses or site restrictions, obtaining prior information can be a prudent decision.<\/p>\n<p>A PIP is particularly valuable when it resolves issues that could otherwise compromise the project or the investment.<\/p>\n<p>For anyone planning a new home, this decision forms part of a broader process, from selecting a plot to completing construction. We explore these stages in <strong><a href=\"https:\/\/mjarc.com\/en\/building-a-house-portugal-steps-to-building-your-home\/\">Building a House in Portugal: The Main Steps<\/a><\/strong>.<\/p>\n<h2>The PIP as a Tool for Protecting and Enhancing an Investment<\/h2>\n<p>The potential of a site cannot be measured solely by how much can be built on it.<\/p>\n<p>A constrained plot may reveal unexpected architectural opportunities. An existing building may preserve spatial and material qualities worth retaining. A restriction on the building footprint may inspire a design that is more closely integrated with the surrounding landscape.<\/p>\n<p>The value of an early assessment also lies in the ability to interpret these factors and connect them to the needs of those who will live in, use or invest in the space.<\/p>\n<p>At MJARC Architects, we see this stage as an integral part of the design process: <strong>first understanding the place, recognising what it allows and what deserves to be preserved, and only then defining the intervention<\/strong>.<\/p>\n<p>This approach is particularly relevant to sustainable renovation, residential architecture and hospitality projects, where the relationship between the existing context, the landscape and the new programme can determine both the quality and feasibility of the proposal.<\/p>\n<h2>Frequently Asked Questions About PIP in Portugal<\/h2>\n<h3><span style=\"font-size: 12pt;\">Can I Apply for a PIP Before Buying a Plot?<\/span><\/h3>\n<p>Yes. Article 14 of the RJUE allows any interested party to request prior information. This can be particularly useful when assessing the planning feasibility of a property before purchase.<\/p>\n<h3><span style=\"font-size: 12pt;\">Can I Submit a PIP for a Renovation Project?<\/span><\/h3>\n<p>Yes. A PIP can clarify the feasibility of reconstruction, alterations, extensions and certain changes of use, depending on the characteristics of the property and the applicable regulations.<\/p>\n<h3><span style=\"font-size: 12pt;\">Does a Favourable PIP Replace the Architectural Project?<\/span><\/h3>\n<p>No. A simple PIP may clarify feasibility without requiring a fully developed project. A qualified PIP may require detailed architectural information, but construction must still comply with all applicable technical and legal requirements.<\/p>\n<h3><span style=\"font-size: 12pt;\">Can I Build on Rural Land Through a PIP?<\/span><\/h3>\n<p>A PIP does not change the legal classification of land or remove existing restrictions. Whether construction is permitted depends on the Municipal Master Plan, other land-use planning instruments and the specific legal regimes applicable to the site.<\/p>\n<h3><span style=\"font-size: 12pt;\">Can Construction Begin Immediately After a Favourable Qualified PIP?<\/span><\/h3>\n<p>No. Even when the PIP exempts the development from licensing or prior notification, legal obligations relating to the commencement of works, technical documentation and construction must still be fulfilled.<\/p>\n<h2>Understanding the Land Before Designing for It<\/h2>\n<p>Every plot and every existing building presents its own opportunities and constraints.<\/p>\n<p>Before developing a proposal, it is essential to understand the planning framework and identify the most appropriate approach to the intervention.<\/p>\n<p>At <strong>MJARC Architects<\/strong>, we develop architectural, renovation, residential and hospitality projects through a careful reading of place, bringing together regulatory requirements, landscape, materiality and the experience of those who will inhabit or use the spaces.<\/p>\n<p><strong>Are you considering buying land, building a house or renovating a property in Portugal?<\/strong><\/p>\n<p>The first step may be to understand its true potential.<\/p>\n<p><strong><a href=\"https:\/\/mjarc.com\/en\/\">Contact MJARC Architects to assess the feasibility of your project.<\/a><\/strong><\/p>\n<p>&nbsp;<\/p>\n<div>\n<hr \/>\n<\/div>\n<h3>Legal References<\/h3>\n<ul>\n<li><strong><a href=\"https:\/\/diariodarepublica.pt\/dr\/legislacao-consolidada\/decreto-lei\/1999-34567875-1129039175\">Decree-Law No. 555\/99 of 16 December<\/a><\/strong> \u2014 Legal Framework for Urbanisation and Building (RJUE), as amended, particularly Articles 11, 14, 16 and 17.<\/li>\n<li><strong><a href=\"https:\/\/diariodarepublica.pt\/dr\/detalhe\/decreto-lei\/108-2026-1128002421\">Decree-Law No. 108\/2026 of 29 May<\/a><\/strong> \u2014 revision of the RJUE.<\/li>\n<li><strong><a href=\"https:\/\/diariodarepublica.pt\/dr\/detalhe\/decreto-lei\/155-b-2026-1153967387\">Decree-Law No. 155-B\/2026 of 31 July<\/a><\/strong> \u2014 amendment to the date of entry into force.<\/li>\n<li><strong><a href=\"https:\/\/diariodarepublica.pt\/dr\/detalhe\/portaria\/320-2026-1153698591\">Ministerial Order No. 320\/2026\/1 of 31 July<\/a><\/strong> \u2014 application forms, supporting documentation requirements and submission conditions.<\/li>\n<\/ul>\n<p><em>Disclaimer: This article is provided for general information and reflects the Portuguese legislative framework applicable as of October 2026. The feasibility of any development and the effects of a favourable Prior Information Request depend on the characteristics of the property, the type of application and the legal provisions applicable to each case. This information does not replace a project-specific technical or legal assessment.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Before designing a house, transforming an existing building or investing in a plot of land, there is one essential question: what can actually be built here? The answer depends on more than the size of the plot or the buildings that surround it. It also depends on planning regulations, environmental constraints, the characteristics of the [&hellip;]<\/p>\n<p class=\"read-more\"><a class=\"button\" href=\"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/\">Read More<\/a><\/p>\n","protected":false},"author":2,"featured_media":19867,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[31],"tags":[],"class_list":["post-19870","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-arquitetura-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>PIP Portugal 2026: Prior Information Request Explained | MJARC<\/title>\n<meta name=\"description\" content=\"Planning to build in Portugal? Learn what a PIP is, when to apply, how long it takes, and what changed under the 2026 planning regulations.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PIP Portugal 2026: Prior Information Request Explained | MJARC\" \/>\n<meta property=\"og:description\" content=\"Planning to build in Portugal? Learn what a PIP is, when to apply, how long it takes, and what changed under the 2026 planning regulations.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/\" \/>\n<meta property=\"og:site_name\" content=\"Mjarc\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/mjarc.arquitectos\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-09T15:54:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-09T15:56:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mjarc.com\/wp-content\/uploads\/2026\/10\/4333998B-5D61-4A93-AB04-935871B5E7A4_1_105_c.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1086\" \/>\n\t<meta property=\"og:image:height\" content=\"724\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Mjarc\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mjarc\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/\"},\"author\":{\"name\":\"Mjarc\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#\\\/schema\\\/person\\\/4b3afbd73b7217bd7abd6435d1e05f2e\"},\"headline\":\"Prior Information Request (PIP): Understanding a Plot\u2019s Potential Before Building\",\"datePublished\":\"2026-10-09T15:54:07+00:00\",\"dateModified\":\"2026-10-09T15:56:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/\"},\"wordCount\":2439,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/4333998B-5D61-4A93-AB04-935871B5E7A4_1_105_c.webp\",\"articleSection\":[\"Architecture\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/\",\"url\":\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/\",\"name\":\"PIP Portugal 2026: Prior Information Request Explained | MJARC\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/4333998B-5D61-4A93-AB04-935871B5E7A4_1_105_c.webp\",\"datePublished\":\"2026-10-09T15:54:07+00:00\",\"dateModified\":\"2026-10-09T15:56:17+00:00\",\"description\":\"Planning to build in Portugal? Learn what a PIP is, when to apply, how long it takes, and what changed under the 2026 planning regulations.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/#primaryimage\",\"url\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/4333998B-5D61-4A93-AB04-935871B5E7A4_1_105_c.webp\",\"contentUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/4333998B-5D61-4A93-AB04-935871B5E7A4_1_105_c.webp\",\"width\":1086,\"height\":724,\"caption\":\"arquiteto ricardo cordeiro da MJARC Arquitetos no escrit\u00f3rio do Porto\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/prior-information-request-pip-portugal\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/mjarc.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Prior Information Request (PIP): Understanding a Plot\u2019s Potential Before Building\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/\",\"name\":\"Mjarc\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#organization\",\"name\":\"Mjarc\",\"url\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/logo_black_1.png\",\"contentUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/logo_black_1.png\",\"width\":130,\"height\":130,\"caption\":\"Mjarc\"},\"image\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/mjarc.arquitectos\\\/\",\"https:\\\/\\\/www.instagram.com\\\/mjarc.arq\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#\\\/schema\\\/person\\\/4b3afbd73b7217bd7abd6435d1e05f2e\",\"name\":\"Mjarc\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/litespeed\\\/avatar\\\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1791488312\",\"url\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/litespeed\\\/avatar\\\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1791488312\",\"contentUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/litespeed\\\/avatar\\\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1791488312\",\"caption\":\"Mjarc\"},\"url\":\"https:\\\/\\\/mjarc.com\\\/en\\\/author\\\/mjarc1\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PIP Portugal 2026: Prior Information Request Explained | MJARC","description":"Planning to build in Portugal? Learn what a PIP is, when to apply, how long it takes, and what changed under the 2026 planning regulations.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/","og_locale":"en_US","og_type":"article","og_title":"PIP Portugal 2026: Prior Information Request Explained | MJARC","og_description":"Planning to build in Portugal? Learn what a PIP is, when to apply, how long it takes, and what changed under the 2026 planning regulations.","og_url":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/","og_site_name":"Mjarc","article_publisher":"https:\/\/www.facebook.com\/mjarc.arquitectos\/","article_published_time":"2026-10-09T15:54:07+00:00","article_modified_time":"2026-10-09T15:56:17+00:00","og_image":[{"width":1086,"height":724,"url":"https:\/\/mjarc.com\/wp-content\/uploads\/2026\/10\/4333998B-5D61-4A93-AB04-935871B5E7A4_1_105_c.webp","type":"image\/webp"}],"author":"Mjarc","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Mjarc","Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/#article","isPartOf":{"@id":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/"},"author":{"name":"Mjarc","@id":"https:\/\/mjarc.com\/fr\/#\/schema\/person\/4b3afbd73b7217bd7abd6435d1e05f2e"},"headline":"Prior Information Request (PIP): Understanding a Plot\u2019s Potential Before Building","datePublished":"2026-10-09T15:54:07+00:00","dateModified":"2026-10-09T15:56:17+00:00","mainEntityOfPage":{"@id":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/"},"wordCount":2439,"commentCount":0,"publisher":{"@id":"https:\/\/mjarc.com\/fr\/#organization"},"image":{"@id":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/#primaryimage"},"thumbnailUrl":"https:\/\/mjarc.com\/wp-content\/uploads\/2026\/10\/4333998B-5D61-4A93-AB04-935871B5E7A4_1_105_c.webp","articleSection":["Architecture"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/","url":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/","name":"PIP Portugal 2026: Prior Information Request Explained | MJARC","isPartOf":{"@id":"https:\/\/mjarc.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/#primaryimage"},"image":{"@id":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/#primaryimage"},"thumbnailUrl":"https:\/\/mjarc.com\/wp-content\/uploads\/2026\/10\/4333998B-5D61-4A93-AB04-935871B5E7A4_1_105_c.webp","datePublished":"2026-10-09T15:54:07+00:00","dateModified":"2026-10-09T15:56:17+00:00","description":"Planning to build in Portugal? Learn what a PIP is, when to apply, how long it takes, and what changed under the 2026 planning regulations.","breadcrumb":{"@id":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/#primaryimage","url":"https:\/\/mjarc.com\/wp-content\/uploads\/2026\/10\/4333998B-5D61-4A93-AB04-935871B5E7A4_1_105_c.webp","contentUrl":"https:\/\/mjarc.com\/wp-content\/uploads\/2026\/10\/4333998B-5D61-4A93-AB04-935871B5E7A4_1_105_c.webp","width":1086,"height":724,"caption":"arquiteto ricardo cordeiro da MJARC Arquitetos no escrit\u00f3rio do Porto"},{"@type":"BreadcrumbList","@id":"https:\/\/mjarc.com\/en\/prior-information-request-pip-portugal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/mjarc.com\/en\/"},{"@type":"ListItem","position":2,"name":"Prior Information Request (PIP): Understanding a Plot\u2019s Potential Before Building"}]},{"@type":"WebSite","@id":"https:\/\/mjarc.com\/fr\/#website","url":"https:\/\/mjarc.com\/fr\/","name":"Mjarc","description":"","publisher":{"@id":"https:\/\/mjarc.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mjarc.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mjarc.com\/fr\/#organization","name":"Mjarc","url":"https:\/\/mjarc.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mjarc.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/08\/logo_black_1.png","contentUrl":"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/08\/logo_black_1.png","width":130,"height":130,"caption":"Mjarc"},"image":{"@id":"https:\/\/mjarc.com\/fr\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/mjarc.arquitectos\/","https:\/\/www.instagram.com\/mjarc.arq\/"]},{"@type":"Person","@id":"https:\/\/mjarc.com\/fr\/#\/schema\/person\/4b3afbd73b7217bd7abd6435d1e05f2e","name":"Mjarc","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mjarc.com\/wp-content\/litespeed\/avatar\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1791488312","url":"https:\/\/mjarc.com\/wp-content\/litespeed\/avatar\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1791488312","contentUrl":"https:\/\/mjarc.com\/wp-content\/litespeed\/avatar\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1791488312","caption":"Mjarc"},"url":"https:\/\/mjarc.com\/en\/author\/mjarc1\/"}]}},"_links":{"self":[{"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/posts\/19870","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/comments?post=19870"}],"version-history":[{"count":1,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/posts\/19870\/revisions"}],"predecessor-version":[{"id":19871,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/posts\/19870\/revisions\/19871"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/media\/19867"}],"wp:attachment":[{"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/media?parent=19870"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/categories?post=19870"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/tags?post=19870"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}