{"id":20216,"date":"2026-11-17T10:00:07","date_gmt":"2026-11-17T10:00:07","guid":{"rendered":"https:\/\/mjarc.com\/?p=20216"},"modified":"2026-11-17T10:02:40","modified_gmt":"2026-11-17T10:02:40","slug":"rehabilitation-unfinished-buildings","status":"publish","type":"post","link":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/","title":{"rendered":"Unfinished Buildings: When the Existing Structure Becomes the Starting Point"},"content":{"rendered":"<h1>Unfinished Buildings: When the Existing Structure Becomes the Starting Point<\/h1>\n<p>Some buildings never fulfil the purpose for which they were designed. Structures erected and abandoned, volumes left exposed to time, constructions that become familiar features of the landscape without ever being truly inhabited.<\/p>\n<p>At first glance, they may seem like buildings without a future. Yet an unfinished structure does not necessarily represent a lost project.<\/p>\n<p>Behind its columns, beams and slabs lies a constructed resource that may hold the potential for a new architectural vision.<\/p>\n<p>The <strong>rehabilitation of unfinished buildings<\/strong> begins with recognising this possibility: understanding the value of what has already been built, identifying its limitations and assessing whether it can be transformed into a contemporary, safe and lasting architectural response.<\/p>\n<p>At MJARC Arquitetos, this approach is reflected in two residential projects of very different scales and contexts: Riverside Condominium, in Santa Comba D\u00e3o, and Green View Tower, in Covilh\u00e3.<\/p>\n<p>Both originate from structures that remained unfinished for decades. And both demonstrate that <strong>architecture does not need to begin on an empty site to create a new identity.<\/strong><\/p>\n<h2>Rehabilitating an Unfinished Building Is Different from Restoring an Old Building<\/h2>\n<p>When we think of architectural rehabilitation, we often associate it with the restoration of historically significant buildings, the preservation of fa\u00e7ades or the adaptation of existing buildings to new uses.<\/p>\n<p>But an unfinished structure presents a different challenge.<\/p>\n<p>Many of these constructions have never developed a fully realised architectural identity. Their spatial organisation may reflect an outdated programme, structural elements may have remained exposed for years, and their original configuration may no longer meet contemporary needs.<\/p>\n<p>The project is therefore not simply about recovering what once existed.<\/p>\n<p><strong>It is about understanding what the existing structure can still become.<\/strong><\/p>\n<p>This shift in perspective changes the nature of the intervention. Rather than treating the original building as a model to reproduce, the architect approaches the existing construction as a set of physical conditions capable of informing a new architectural solution.<\/p>\n<p>The position of columns, the structural grid of slabs, the location of circulation cores and the relationship with the site become both constraints and opportunities.<\/p>\n<p>The challenge is to develop an architecture that engages with these existing conditions without being limited by the intentions of a project that was never completed.<\/p>\n<h2>Before Transforming, We Must Understand: Assessing the Existing Structure<\/h2>\n<p>The first question when approaching an unfinished building should not be what we want to build, but what the existing structure can actually accommodate.<\/p>\n<p>The fact that a building has remained standing for decades does not, in itself, demonstrate its ability to support a new programme or meet current safety requirements.<\/p>\n<p>Structures exposed to the elements for extended periods may experience different forms of deterioration, depending on their materials, environmental conditions, original construction quality and the protection of structural components.<\/p>\n<p>In reinforced concrete structures, for example, carbonation, reinforcement corrosion, cracking or localised deterioration may occur. Their presence, extent and consequences must be established through technical assessment.<\/p>\n<h3>From Building Survey to Structural Diagnosis<\/h3>\n<p>Rehabilitation should begin with a thorough assessment of the existing building, involving appropriately qualified professionals from the relevant disciplines.<\/p>\n<p>Depending on the available information and the characteristics of the structure, this assessment may include:<\/p>\n<ul>\n<li>Reviewing original architectural and engineering drawings and technical documentation.<\/li>\n<li>Conducting measured surveys and identifying structural elements.<\/li>\n<li>Inspecting the condition of columns, beams, slabs and foundations.<\/li>\n<li>Performing tests and analyses to characterise materials and identify deterioration.<\/li>\n<li>Assessing load-bearing capacity and seismic performance.<\/li>\n<li>Studying the modifications required to accommodate the new architectural programme.<\/li>\n<\/ul>\n<p>This assessment should not be regarded as a formality preceding the design process. It is essential to determining the real potential of the intervention.<\/p>\n<p>Methods for evaluating existing structures, including those related to seismic safety, require an appropriate understanding of the building and its construction characteristics.<\/p>\n<h3>Preservation Does Not Mean Keeping Everything<\/h3>\n<p>One of the most important decisions is determining which elements can be retained, which require strengthening and which may need to be replaced or removed.<\/p>\n<p>Maximum preservation should not be treated as an absolute objective, regardless of the building&#8217;s condition.<\/p>\n<p>A responsible intervention seeks to balance safety, technical feasibility, environmental performance, architectural quality and economic viability.<\/p>\n<p>In some situations, retaining a substantial proportion of the existing structure can significantly reduce the need for new construction materials. In others, extensive strengthening or adaptation may be necessary.<\/p>\n<p>The value of rehabilitation lies not only in the amount of material preserved, but in the ability to establish a technically sound basis for its continued use.<\/p>\n<h2>The Existing Structure as Both Constraint and Architectural Opportunity<\/h2>\n<p>Working with an existing structure means accepting that certain decisions have already been made.<\/p>\n<p>Column spacing, floor-to-floor heights, the position of circulation cores and slab depths are conditions that cannot simply be ignored.<\/p>\n<p>Yet these limitations can become the starting point for new architectural solutions.<\/p>\n<p>An existing structural grid can guide the organisation of interior spaces. A slab can be reinterpreted to create balconies or outdoor areas. An originally enclosed volume may become more open through carefully considered architectural interventions.<\/p>\n<p>This approach requires a different design process from that of an entirely new building.<\/p>\n<p>Rather than defining the desired form first and subsequently developing the structure to support it, the project begins by exploring the transformation potential of a structure that already exists.<\/p>\n<p>The result does not need to reproduce the original architecture.<\/p>\n<p>Instead, it can reveal an entirely new identity, developed from what remains.<\/p>\n<h2>Riverside: Transforming an Unfinished Structure into a New Relationship with the Landscape<\/h2>\n<p><strong>Santa Comba D\u00e3o | Multifamily Residential | Completed Project<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-16364\" src=\"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/07\/010-1000x667.webp\" alt=\"Edif\u00edcio de apartamentos moderno de quatro andares com revestimento em madeira escura e grandes janelas. O telhado \u00e9 cinzento e possui uma forma geom\u00e9trica ondulada proeminente, saliente. O edif\u00edcio apresenta varandas em toda a fachada. Em primeiro plano, h\u00e1 um jardim relvado bem cuidado com pequenos arbustos e \u00e1rvores jovens, ladeado por uma rampa de bet\u00e3o. Arquitetura MJARC Arquitetos\" width=\"1000\" height=\"667\" srcset=\"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/07\/010-1000x667.webp 1000w, https:\/\/mjarc.com\/wp-content\/uploads\/2023\/07\/010-768x512.webp 768w, https:\/\/mjarc.com\/wp-content\/uploads\/2023\/07\/010-1536x1024.webp 1536w, https:\/\/mjarc.com\/wp-content\/uploads\/2023\/07\/010.webp 1600w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p>For more than two decades, an unfinished structure stood on the slopes overlooking the D\u00e3o River, shaping the landscape of Santa Comba D\u00e3o without ever fulfilling its residential purpose.<\/p>\n<p>When MJARC was invited to develop the Riverside project, the building consisted essentially of its original structure.<\/p>\n<p>The intervention began with a fundamental question: how could this construction be transformed into a contemporary residential development without discarding the building resources already in place?<\/p>\n<p>The answer involved a profound architectural reinterpretation.<\/p>\n<h3>Redefining the Building&#8217;s Form Without Starting from Scratch<\/h3>\n<p>One of the project&#8217;s central objectives was to reduce the building&#8217;s perceived mass and open its spaces towards the surrounding landscape.<\/p>\n<p>This intention informed the transformation of its form, the reorganisation of the apartments and the relationship between the fa\u00e7ades and outdoor areas.<\/p>\n<p>The original residential units were adapted to a new functional layout, while the balconies were reconfigured through carefully considered cut-outs, establishing a closer relationship between interior spaces and their natural surroundings.<\/p>\n<p>The existing structure became more than the building&#8217;s physical support. It became the foundation of a new architectural composition.<\/p>\n<p>The result is a residential development comprising four floors above ground and 28 two- and three-bedroom apartments.<\/p>\n<h3>Preserving the Structure, Transforming the Experience<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-16340\" src=\"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/07\/IMG-1-1000x750.webp\" alt=\"edificio riverside antes de ser reconstruido\" width=\"1000\" height=\"750\" srcset=\"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/07\/IMG-1-1000x750.webp 1000w, https:\/\/mjarc.com\/wp-content\/uploads\/2023\/07\/IMG-1-768x576.webp 768w, https:\/\/mjarc.com\/wp-content\/uploads\/2023\/07\/IMG-1-1536x1152.webp 1536w, https:\/\/mjarc.com\/wp-content\/uploads\/2023\/07\/IMG-1.webp 1600w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p>The Riverside project retained <strong>more than 90% of the original structure<\/strong>, including columns, beams and slabs, as well as <strong>75% of the original structural core<\/strong>.<\/p>\n<p>This strategy reduced the need to replace substantial structural elements, allowing the intervention to focus on architectural transformation and the building&#8217;s functional adaptation.<\/p>\n<p>The new exterior expression introduced bamboo cladding, a zinc roof and transitional spaces that reinforce the horizontality of the composition.<\/p>\n<p>The transformation also extended to the surrounding landscape. Areas previously occupied by vehicle circulation and parking were replaced by gardens and access pathways integrated into the landscape design.<\/p>\n<p>Architecture thus established a different relationship with the site.<\/p>\n<p>More than completing an interrupted construction, Riverside redefined how the building relates to the river, the landscape and the everyday experience of its inhabitants.<\/p>\n<p><a href=\"https:\/\/mjarc.com\/en\/architecture-projects\/riverside-building-residential-architecture\/\">Explore Riverside Condominium<\/a>.<\/p>\n<h2>Green View Tower: Reimagining a Structure That Shaped Covilh\u00e3 for Half a Century<\/h2>\n<p><strong>Covilh\u00e3 | Multifamily Residential | Rehabilitation Project Under Development<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-20202\" src=\"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/11\/Vista_4_RF-1-1000x750.webp\" alt=\"Antiga torre santo ant\u00f3nio, agora torre green view na covilh\u00e3 projeto de reabilita\u00e7\u00e3o mjarc arquitetos\" width=\"1000\" height=\"750\" srcset=\"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/11\/Vista_4_RF-1-1000x750.webp 1000w, https:\/\/mjarc.com\/wp-content\/uploads\/2023\/11\/Vista_4_RF-1-768x576.webp 768w, https:\/\/mjarc.com\/wp-content\/uploads\/2023\/11\/Vista_4_RF-1-1536x1152.webp 1536w, https:\/\/mjarc.com\/wp-content\/uploads\/2023\/11\/Vista_4_RF-1.webp 1880w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p>In Covilh\u00e3, the challenge takes on a different scale.<\/p>\n<p>Built in the 1970s, the former Torre de Santo Ant\u00f3nio remained unfinished for more than fifty years, becoming an unmistakable presence in the city&#8217;s urban landscape.<\/p>\n<p>Originally designed as a 20-storey structure, the tower was conceived for a future that never materialised.<\/p>\n<p>Over the decades, its presence became part of the city&#8217;s visual identity, but also of its collective memory as an interrupted construction.<\/p>\n<p>MJARC&#8217;s proposal for Green View Tower begins with this particular condition: a building that was never completed, yet already occupies a recognisable place within the city.<\/p>\n<h3>Assessing What Exists to Accommodate a New Programme<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-18569\" src=\"https:\/\/mjarc.com\/wp-content\/uploads\/2026\/05\/2-800x1000.webp\" alt=\"torre de santo ant\u00f3nio na covilh\u00e3 ap\u00f3s 50 anos de abandono\" width=\"365\" height=\"456\" srcset=\"https:\/\/mjarc.com\/wp-content\/uploads\/2026\/05\/2-800x1000.webp 800w, https:\/\/mjarc.com\/wp-content\/uploads\/2026\/05\/2-768x960.webp 768w, https:\/\/mjarc.com\/wp-content\/uploads\/2026\/05\/2.webp 1080w\" sizes=\"auto, (max-width: 365px) 100vw, 365px\" \/><\/p>\n<p>The proposed intervention aims to retain <strong>more than 65% of the original structure<\/strong>, including beams, columns and slabs, together with <strong>75% of the existing structural core<\/strong>.<\/p>\n<p>This strategy forms the basis of a transformation that envisages a residential building with 16 floors above ground and 87 two- and three-bedroom apartments.<\/p>\n<p>The new programme also incorporates shared facilities, including a gym, coworking space and laundry room, responding to contemporary ways of living.<\/p>\n<p>The transformation extends beyond the interior organisation.<\/p>\n<p>The fa\u00e7ade is reinterpreted through horizontal elements, new relationships between solid and void, and integrated greenery intended to establish a closer visual connection with the Serra da Estrela landscape.<\/p>\n<p>The proposal also introduces communal outdoor spaces and reconsiders the relationship between the building and its surroundings.<\/p>\n<h3>Transforming Without Erasing Its Urban Presence<\/h3>\n<p>Unlike a building with no established presence in the landscape, Torre de Santo Ant\u00f3nio acquired its own identity over time.<\/p>\n<p>Its transformation therefore presents an additional challenge: creating a new architectural expression without ignoring the presence the building has already established within the city.<\/p>\n<p>In this context, preserving part of the structure is more than a construction decision. It also allows the physical continuity of a familiar urban landmark.<\/p>\n<p>Green View Tower demonstrates how the rehabilitation of an unfinished structure can bring together technical feasibility, formal transformation and renewed use.<\/p>\n<p>The project received a <strong>Special Mention at the 2026 Architizer A+Awards<\/strong>, in the Unbuilt Multifamily Housing (10+ Floors) category, recognising the architectural proposal.<\/p>\n<p><a href=\"https:\/\/mjarc.com\/en\/architecture-projects\/green-view-tower\/\">Explore Green View Tower<\/a>.<\/p>\n<h2>Can Reusing Existing Structures Reduce Environmental Impact?<\/h2>\n<p>Reusing existing structures can offer an important opportunity to reduce raw material extraction, the production of new construction materials and the waste associated with demolition.<\/p>\n<p>Elements such as columns, beams, slabs and foundations contain significant quantities of materials and represent energy already invested in their manufacture and construction.<\/p>\n<p>When these components can be retained and adapted, part of that investment remains embodied in the new building.<\/p>\n<p>This approach aligns with the principles of circular construction, which seek to extend the useful life of existing resources and reduce the need for premature replacement.<\/p>\n<p>However, <strong>rehabilitation does not automatically guarantee a lower environmental impact<\/strong>.<\/p>\n<p>The environmental benefits depend on factors such as the extent of structural strengthening, the materials added, the required construction modifications, the durability of the intervention and the building&#8217;s energy performance throughout its use.<\/p>\n<p>A consistent assessment must therefore consider not only what is preserved, but also what needs to be added or replaced.<\/p>\n<p>Comparing rehabilitation with new construction benefits from a life cycle assessment capable of evaluating the environmental impacts of different alternatives.<\/p>\n<p>In Riverside and Green View Tower, the high proportions of structural reuse are tangible indicators of the strategies adopted.<\/p>\n<p>However, the percentages of structure retained should not be interpreted as equivalent reductions in carbon emissions.<\/p>\n<p>Quantifying these reductions requires a specific environmental assessment.<\/p>\n<h2>When Is It Worth Rehabilitating an Unfinished Structure?<\/h2>\n<p>The decision to rehabilitate an unfinished building should result from an integrated assessment of several factors.<\/p>\n<p>Structural safety and condition are essential starting points, but they are not sufficient on their own to justify an intervention.<\/p>\n<p>It is equally important to understand whether the existing geometry can accommodate an appropriate programme, whether daylight, ventilation and accessibility can be improved, and whether the required investment is proportionate to the intended transformation.<\/p>\n<p>Planning and regulatory feasibility must also be assessed, since the physical existence of a structure does not automatically guarantee permission to complete or modify the original development.<\/p>\n<p>In general, the assessment should address four fundamental dimensions:<\/p>\n<ul>\n<li><strong>Technical feasibility:<\/strong> structural safety, condition and potential for adaptation.<\/li>\n<li><strong>Architectural feasibility:<\/strong> the structure&#8217;s capacity to accommodate a high-quality spatial organisation.<\/li>\n<li><strong>Economic feasibility:<\/strong> the costs of rehabilitation, strengthening, transformation and future maintenance.<\/li>\n<li><strong>Environmental feasibility:<\/strong> the relationship between preserved resources, new materials and performance throughout the building&#8217;s life cycle.<\/li>\n<\/ul>\n<p>None of these dimensions should be considered in isolation.<\/p>\n<p>A building may have a recoverable structure but an unsuitable spatial configuration. An architectural opportunity may be significant, yet its implementation may require extensive technical interventions.<\/p>\n<p>The true potential of an existing structure only becomes clear when these conditions are examined together.<\/p>\n<h2>Architecture as a Means of Transforming What Already Exists<\/h2>\n<p>Riverside and Green View Tower demonstrate that the rehabilitation of unfinished structures does not follow a single model.<\/p>\n<p>In one case, the transformation of a four-storey residential structure made it possible to redefine the building&#8217;s form, outdoor spaces and relationship with the D\u00e3o River landscape.<\/p>\n<p>In the other, the reinterpretation of an unfinished tower seeks to create a renewed residential landmark from a structure that has shaped Covilh\u00e3 for decades.<\/p>\n<p>The scales, contexts and architectural responses differ. Yet the underlying principle remains the same: understand what exists before deciding what should be built.<\/p>\n<p>This approach does not mean accepting every limitation of the original construction or indiscriminately preserving every element.<\/p>\n<p>It means recognising that architectural quality and identity can emerge precisely from the dialogue between existing material and contemporary needs.<\/p>\n<p>At MJARC, we understand rehabilitation as a process that requires technical knowledge, critical judgement and architectural imagination.<\/p>\n<p>It demands rigorous assessment, but also the ability to recognise possibilities where, at first glance, there appear to be only constraints.<\/p>\n<p><strong>Because an unfinished structure does not have to determine a building&#8217;s future. It may be precisely what makes it possible to imagine a different one.<\/strong><\/p>\n<h2>Frequently Asked Questions About the Rehabilitation of Unfinished Buildings<\/h2>\n<h3>Can a Building Be Rehabilitated After Remaining Unfinished for Many Years?<\/h3>\n<p>Yes, under certain conditions. Feasibility depends on its state of conservation, structural safety, construction characteristics and capacity to meet current requirements. A technical assessment is essential before deciding on the intervention.<\/p>\n<h3>How Is the Safety of an Unfinished Structure Assessed?<\/h3>\n<p>The assessment may involve document reviews, measured surveys, inspections, material testing and structural verification, including seismic performance assessment where applicable. The scope should be defined by suitably qualified engineers and other relevant professionals according to the building&#8217;s characteristics.<\/p>\n<h3>Is It Possible to Change a Building&#8217;s Layout While Retaining Its Existing Structure?<\/h3>\n<p>Yes. Depending on its configuration and structural capacity, it may be possible to reorganise interior layouts, reconfigure balconies, alter fa\u00e7ades and adapt the building to new uses. Any modifications must remain compatible with the load-bearing elements and applicable technical and regulatory requirements.<\/p>\n<h3>Is Rehabilitating an Unfinished Structure Cheaper Than Building from Scratch?<\/h3>\n<p>Not necessarily. Reusing an existing structure may avoid some of the costs associated with constructing a new one, but diagnosis, strengthening, adaptation and repairs can require substantial investment. A project-specific cost comparison is necessary.<\/p>\n<h3>Can Reusing Structures Reduce Carbon Emissions?<\/h3>\n<p>Potentially, particularly when it avoids the production of significant quantities of new construction materials. However, actual reductions depend on the materials retained, the strengthening and components added, and the building&#8217;s overall performance. A comparative life cycle assessment is needed to quantify these benefits.<\/p>\n<h3>Can an Unfinished Structure Be Converted to a Different Use?<\/h3>\n<p>In many cases, yes. The feasibility of changing a building&#8217;s use depends on its structural configuration, spatial organisation, safety, accessibility and performance requirements, as well as the applicable planning and regulatory framework.<\/p>\n<h2>Considering the Future of an Unfinished Building?<\/h2>\n<p>Every existing structure presents a different combination of constraints and opportunities. Understanding its condition, development potential and architectural possibilities is the first step towards a responsible transformation.<\/p>\n<p>At <strong>MJARC Arquitetos<\/strong>, we approach rehabilitation through an integrated understanding of architecture, technical feasibility and the relationship between buildings and their surroundings.<\/p>\n<p><strong>If you are considering the rehabilitation or transformation of an unfinished building, <\/strong><a href=\"https:\/\/mjarc.com\/en\/contacts\/\"><strong>contact MJARC Arquitetos<\/strong><\/a><strong> to discuss your project and explore its potential.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Unfinished Buildings: When the Existing Structure Becomes the Starting Point Some buildings never fulfil the purpose for which they were designed. Structures erected and abandoned, volumes left exposed to time, constructions that become familiar features of the landscape without ever being truly inhabited. At first glance, they may seem like buildings without a future. Yet [&hellip;]<\/p>\n<p class=\"read-more\"><a class=\"button\" href=\"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/\">Read More<\/a><\/p>\n","protected":false},"author":2,"featured_media":20203,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[31],"tags":[],"class_list":["post-20216","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-arquitetura-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rehabilitation of Unfinished Buildings: Structure and Transformation<\/title>\n<meta name=\"description\" content=\"How can unfinished buildings be rehabilitated? Explore structural assessment, architectural transformation and MJARC&#039;s Riverside and Green View Tower projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rehabilitation of Unfinished Buildings: Structure and Transformation\" \/>\n<meta property=\"og:description\" content=\"How can unfinished buildings be rehabilitated? Explore structural assessment, architectural transformation and MJARC&#039;s Riverside and Green View Tower projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/\" \/>\n<meta property=\"og:site_name\" content=\"Mjarc\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/mjarc.arquitectos\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-17T10:00:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-17T10:02:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/11\/Vista_4_RF-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1880\" \/>\n\t<meta property=\"og:image:height\" content=\"1410\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Mjarc\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mjarc\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/\"},\"author\":{\"name\":\"Mjarc\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#\\\/schema\\\/person\\\/4b3afbd73b7217bd7abd6435d1e05f2e\"},\"headline\":\"Unfinished Buildings: When the Existing Structure Becomes the Starting Point\",\"datePublished\":\"2026-11-17T10:00:07+00:00\",\"dateModified\":\"2026-11-17T10:02:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/\"},\"wordCount\":2668,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Vista_4_RF-1.webp\",\"articleSection\":[\"Architecture\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/\",\"url\":\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/\",\"name\":\"Rehabilitation of Unfinished Buildings: Structure and Transformation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Vista_4_RF-1.webp\",\"datePublished\":\"2026-11-17T10:00:07+00:00\",\"dateModified\":\"2026-11-17T10:02:40+00:00\",\"description\":\"How can unfinished buildings be rehabilitated? Explore structural assessment, architectural transformation and MJARC's Riverside and Green View Tower projects.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/#primaryimage\",\"url\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Vista_4_RF-1.webp\",\"contentUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Vista_4_RF-1.webp\",\"width\":1880,\"height\":1410,\"caption\":\"Antiga torre santo ant\u00f3nio, agora torre green view na covilh\u00e3 projeto de reabilita\u00e7\u00e3o mjarc arquitetos\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/en\\\/rehabilitation-unfinished-buildings\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/mjarc.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Unfinished Buildings: When the Existing Structure Becomes the Starting Point\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/\",\"name\":\"Mjarc\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#organization\",\"name\":\"Mjarc\",\"url\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/logo_black_1.png\",\"contentUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/logo_black_1.png\",\"width\":130,\"height\":130,\"caption\":\"Mjarc\"},\"image\":{\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/mjarc.arquitectos\\\/\",\"https:\\\/\\\/www.instagram.com\\\/mjarc.arq\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/fr\\\/#\\\/schema\\\/person\\\/4b3afbd73b7217bd7abd6435d1e05f2e\",\"name\":\"Mjarc\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/litespeed\\\/avatar\\\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1794513239\",\"url\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/litespeed\\\/avatar\\\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1794513239\",\"contentUrl\":\"https:\\\/\\\/mjarc.com\\\/wp-content\\\/litespeed\\\/avatar\\\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1794513239\",\"caption\":\"Mjarc\"},\"url\":\"https:\\\/\\\/mjarc.com\\\/en\\\/author\\\/mjarc1\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rehabilitation of Unfinished Buildings: Structure and Transformation","description":"How can unfinished buildings be rehabilitated? Explore structural assessment, architectural transformation and MJARC's Riverside and Green View Tower projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/","og_locale":"en_US","og_type":"article","og_title":"Rehabilitation of Unfinished Buildings: Structure and Transformation","og_description":"How can unfinished buildings be rehabilitated? Explore structural assessment, architectural transformation and MJARC's Riverside and Green View Tower projects.","og_url":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/","og_site_name":"Mjarc","article_publisher":"https:\/\/www.facebook.com\/mjarc.arquitectos\/","article_published_time":"2026-11-17T10:00:07+00:00","article_modified_time":"2026-11-17T10:02:40+00:00","og_image":[{"width":1880,"height":1410,"url":"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/11\/Vista_4_RF-1.webp","type":"image\/webp"}],"author":"Mjarc","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Mjarc","Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/#article","isPartOf":{"@id":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/"},"author":{"name":"Mjarc","@id":"https:\/\/mjarc.com\/fr\/#\/schema\/person\/4b3afbd73b7217bd7abd6435d1e05f2e"},"headline":"Unfinished Buildings: When the Existing Structure Becomes the Starting Point","datePublished":"2026-11-17T10:00:07+00:00","dateModified":"2026-11-17T10:02:40+00:00","mainEntityOfPage":{"@id":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/"},"wordCount":2668,"commentCount":0,"publisher":{"@id":"https:\/\/mjarc.com\/fr\/#organization"},"image":{"@id":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/#primaryimage"},"thumbnailUrl":"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/11\/Vista_4_RF-1.webp","articleSection":["Architecture"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/","url":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/","name":"Rehabilitation of Unfinished Buildings: Structure and Transformation","isPartOf":{"@id":"https:\/\/mjarc.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/#primaryimage"},"image":{"@id":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/#primaryimage"},"thumbnailUrl":"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/11\/Vista_4_RF-1.webp","datePublished":"2026-11-17T10:00:07+00:00","dateModified":"2026-11-17T10:02:40+00:00","description":"How can unfinished buildings be rehabilitated? Explore structural assessment, architectural transformation and MJARC's Riverside and Green View Tower projects.","breadcrumb":{"@id":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/#primaryimage","url":"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/11\/Vista_4_RF-1.webp","contentUrl":"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/11\/Vista_4_RF-1.webp","width":1880,"height":1410,"caption":"Antiga torre santo ant\u00f3nio, agora torre green view na covilh\u00e3 projeto de reabilita\u00e7\u00e3o mjarc arquitetos"},{"@type":"BreadcrumbList","@id":"https:\/\/mjarc.com\/en\/rehabilitation-unfinished-buildings\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/mjarc.com\/en\/"},{"@type":"ListItem","position":2,"name":"Unfinished Buildings: When the Existing Structure Becomes the Starting Point"}]},{"@type":"WebSite","@id":"https:\/\/mjarc.com\/fr\/#website","url":"https:\/\/mjarc.com\/fr\/","name":"Mjarc","description":"","publisher":{"@id":"https:\/\/mjarc.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mjarc.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mjarc.com\/fr\/#organization","name":"Mjarc","url":"https:\/\/mjarc.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mjarc.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/08\/logo_black_1.png","contentUrl":"https:\/\/mjarc.com\/wp-content\/uploads\/2023\/08\/logo_black_1.png","width":130,"height":130,"caption":"Mjarc"},"image":{"@id":"https:\/\/mjarc.com\/fr\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/mjarc.arquitectos\/","https:\/\/www.instagram.com\/mjarc.arq\/"]},{"@type":"Person","@id":"https:\/\/mjarc.com\/fr\/#\/schema\/person\/4b3afbd73b7217bd7abd6435d1e05f2e","name":"Mjarc","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mjarc.com\/wp-content\/litespeed\/avatar\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1794513239","url":"https:\/\/mjarc.com\/wp-content\/litespeed\/avatar\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1794513239","contentUrl":"https:\/\/mjarc.com\/wp-content\/litespeed\/avatar\/bbed492adff5646ba02f6c482eda4fc3.jpg?ver=1794513239","caption":"Mjarc"},"url":"https:\/\/mjarc.com\/en\/author\/mjarc1\/"}]}},"_links":{"self":[{"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/posts\/20216","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/comments?post=20216"}],"version-history":[{"count":1,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/posts\/20216\/revisions"}],"predecessor-version":[{"id":20217,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/posts\/20216\/revisions\/20217"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/media\/20203"}],"wp:attachment":[{"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/media?parent=20216"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/categories?post=20216"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mjarc.com\/en\/wp-json\/wp\/v2\/tags?post=20216"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}